David Nordin – Detailed Project CV

David Nordin

Detailed Project CV

David Nordin

Principal Engineer & Technical Strategist
Extended project and assignment history covering all engagements, roles and technical responsibilities.

Project history

  • Vattenfall Ringhals – Ringhals nuclear power plant — 2024
    I&C Technical Area Lead · Nuclear power

    System design, system construction and technical area responsibility for instrumentation and control in a nuclear power environment.

  • Västfastigheter, Östra Hospital – New operating department — 2024
    Automation Design Lead · Healthcare

    Design of advanced BMS and control functions for operating theatres, cleanroom environments, airlocks and controlled pressure relationships.

  • City of Gothenburg, Kretslopp & Vatten – Stormwater reservoir control and forecasting — 2023 to 2024
    Technical Consultant and Automation Designer · Water and wastewater

    Automation design for flow control, forecasting and reservoir operation during heavy rainfall and stormwater events.

  • City of Gothenburg, Kretslopp & Vatten – Vitsippsbäcken research facilities — 2023 to 2024
    Specialist Consultant · Water treatment research

    Technical investigation and design for two experimental stormwater treatment facilities with extensive sensors, components and autonomous control.

  • Novo Energy AB – Battery factory — 2023 to 2024
    Assignment Lead and Technical Lead for Automation and Integration Platform · Industrial production

    Designed the integration platform, SCADA concept and automation structures for PMS, UMS, BMS, LMS and EMS. Supported early-stage requirements, procurement, supplier evaluation and negotiation for a large battery-manufacturing programme.

  • Västfastigheter – Maternity and neonatal centre — 2020 to 2023
    Assignment Lead, Control and Monitoring Systems · Healthcare

    Led BMS and control design for a large hospital project with high redundancy, advanced VAV, room controls, technical descriptions, drawings and multidisciplinary coordination.

  • Veitech AB – Advanced industrial and test facility — 2022 to 2023
    Assignment Lead · Industrial and laboratory

    System design, cost estimates, detailed BMS design, BIM coordination and interface management for a facility with hydrogen cells, battery cells, electric motors and test rigs.

  • AVISEQ / LFV – Technical operations organisation, Malmö Airport — 2022 to 2023
    Advisor · Aviation

    Developed a new organisation model for technical operations, maintenance and facility management, including current-state assessment, gap analysis and improvement programme.

  • Swedavia, Stockholm Arlanda Airport – Chlorination and process water systems — 2021 to 2023
    Technical Investigator · Aviation and process water

    Investigated and corrected process water and chlorination systems requiring precise autonomous operation for airport-wide use.

  • West Link Contractors, NCC and Wayss & Freytag – West Link E05 Korsvägen — 2020 to 2022
    Technical Area Lead, Infrastructure Automation · Rail infrastructure

    Design requirements, technical direction and construction responsibility for control and monitoring systems in a major rail infrastructure programme.

  • Salem Municipality – Fågelsången school and sports hall — 2018 to 2021
    Assignment Lead, Control and Monitoring Systems · Education and public buildings

    Early-stage studies, detailed automation design, control narratives, technical specifications and procurement documentation for a new school for 540 pupils and a full-size sports hall.

  • H&M and Fabege – Digitalisation and data advisory — 2019 to 2020
    Digitalisation Advisor · Enterprise and property portfolios

    Advisory on IoT, measurement data collection, information refinement and implementation of digital capabilities across international and large portfolio contexts.

  • Locum / Region Stockholm – Karolinska hospital area, N block — 2017 to 2020
    Assignment Lead and Designer · Healthcare

    Assignment management and control system design for refurbishment and adaptation of approximately 15,000 square metres of hospital facilities.

  • National Property Board Sweden – Swedish Embassy in Norway — 2017 to 2020
    Assignment Lead, Control and Monitoring Systems · Government and cultural heritage

    System and construction design for automation of heating, cooling, gas and ventilation in a heritage-sensitive refurbishment.

  • City of Stockholm and Hotel Diplomat – Östermalm Market Hall and hotel — 2017 to 2020
    Assignment Lead and Designer · Commercial and heritage buildings

    Automation and technical design for market hall and hotel environments, including climate, water systems, treatment functions and operational controls.

  • Swedavia, Stockholm Arlanda Airport – Hotel, Pier G, aircraft stands and water systems — 2017 to 2019
    Assignment Lead and Designer · Aviation infrastructure

    Control and monitoring design across multiple airport expansion and utility projects, including terminal-adjacent infrastructure, hotel facilities and chlorination systems.

  • Akademiska Hus – Karolinska Institute laboratories, MTC Annex 1 — 2017 to 2019
    Automation Designer · Laboratories

    Automation design for high-grade laboratory environments with redundant ventilation, advanced climate control, decontamination and barrier systems.

  • Locum / Region Stockholm – Rosenlund Hospital, MRI/CT and urgent care — 2017 to 2019
    Assignment Lead and Designer · Healthcare

    Room, climate and humidity control for MRI/CT technical environments and operational adaptation of urgent-care facilities.

  • Locum / Region Stockholm – Buildings 10, 12, 14 and 16 — 2017 to 2018
    Automation Designer · Healthcare

    Improvement programme and refurbishment design for ventilation controls, fire dampers, control replacement and smoke-extraction systems.

  • ÅF Infrastructure – Nacka Entré residential development — 2017
    Assignment Lead and Designer · Residential buildings

    Automation and HVAC-related design for multi-family housing with heat-pump, ventilation heat-recovery and storage-control functions.

  • Church of Sweden – Lännäs Church — 2016 to 2017
    Assignment Lead, Control and Monitoring Systems · Cultural heritage

    Designed discreet climate and humidity control to protect historic surfaces, art and the organ after long-term moisture damage.

  • Sala Municipality – Aquatic centre — 2015
    Designer and Automation Engineer · Public facilities and water treatment

    Automation for water treatment, wave machinery and interactive water features.

  • Mostorps Castle – Hydropower plant, switchgear and site network — 2013 to 2015
    Assignment Lead, Designer and Project Manager · Energy and heritage

    Modernisation and design of hydropower, switchgear, lightning protection, site power, fibre and communications in a heritage environment.

Contact us